Repairs to the railway bridge (Pisuerga)

Structural typology: Existing
Completed: July, 2012
Owner: ADIF
Scope: Extension and Structural Rehabilitation

The interventions which took place have been on one hand the construction of a cantilevered service lane on the side of the bridge and on the other the operations of cleaning and structural rehabilitation. These operations included the cleaning up and repair of the concrete facing and the subsequent application of anti-carbonation paint. The arch masonrywork was repointed and then injected with grout for consolidation. Improvements were made in drainage including spills, weep holes and sealing of joints between deck slabs.



Related projects



Calle Barquillo 23, 2º
28004 Madrid
Tlf: +34 917014460
Fax: +34 915327864
Email: fhecor@fhecor.es