Nine Elms Pimlico Bridge over the Thames River

Londres, Reino Unido

Structural typology: TENDER DESIGN
Date: January, 2015
Scope: tender design
Architect: Scott Brownrigg Ltd.

International competition delivered in a DJV with Grontmij N.V. and Scott Brownrigg Ltd.

truss bridge with traffics of cycles and pedestrians separated in two different levels
main span: 150m / vertical clearance: 10,96m


FHECOR
Calle Barquillo 23, 2º | 28004 Madrid | España
T. (+34) 917 014 460 | F. (+34) 915 327 864
www.fhecor.com | fhecor@fhecor.es